Construction across the Pinares de San Antón development is moving ahead with solid progress:
- Villa 1: Structure advancing from first to second floor.
- Villas 3 & 4: Excavation complete, final levels reached.
- Villas 4 & 5: Gabion retaining walls installed.
- Villa 5: Pool structure underway; drainage and backfill in progress.
- Villa 6: Structure rising steadily.
- Villa 7: Structure complete; windows installed, brickwork done, and interiors underway.
- Villa 8: Structural works nearly finished.
- Villas 9 & 10: Ground floor structures progressing well.
- Landscaping: Garden walls and terrace shaping ongoing, enhancing the site’s overall layout.
The project continues to take shape with each phase adding definition to this unique hillside development.